|
|
|
|
|
|
|
|
|
|
|
Specially made to be used inside a 2" x 4" stud wall construction. Use in drain-waste-vent applications to join straight lengths of pipe.
|
Used to change direction in piping inside a 2" x 4" stud wall construction for drain-waste-vent applications. Sometimes called an eighth bend.
|
Inserts into fitting hub to reduce to smaller pipe size. For use inside a 2" x 4" stud wall construction in drain-waste-vent applications.
|
|
|
|
|
|
|
|
|
|
|
|
|
Used for permanently or temporarily capping pipe inside a 2" x 4" stud wall construction in drain-waste-vent applications.
|
Used when connecting a branch line into a horizontal drain pipe. Also, used in conjunction with a Twist-Lok plug to provide a cleanout in a drain pipe.
|
Provides an easily removable closure at any fitting hub.
|
|
|
|
|
|
|
|
|
|
|
|
|
Inserts into fitting hub to reduce to smaller pipe size. For use inside a 2" x 4" stud wall construction in drain-waste-vent applications.
|
Used to change direction in piping. Sometimes call a "quarter bend".
|
Used when connecting a branch line into a horizontal drain pipe. Also, used in conjunction with a Twist-Lok plug to provide a cleanout in a drain pipe.
|
|
|
|
|
|
|
|
|
Adapts 3" Schedule 30 pipe to 4" sewer pipe inside a 2" x 4" stud wall construction in drain-waste-vent applications.
|
|